Con4Mare provides Load Out Coordination services for the He Dreiht Offshore Windfarm project. Our scope includes Load-out for interim transport, load in, storage, Load-out on transport barge, and seafastening. The He Dreiht wind farm, set to be one of Europe’s largest energy transition projects with an installed output of 960 MW, will supply 1.1 million households with renewable energy.